

Gurugram Testing Lab
Every unit undergoes rigorous thermal imaging, load testing, and copper winding quality verification before dispatch across India.
Engineering Protocol
No wattage inflation -- zero compromises on continuous peak load stability.
Quality Assurance
3-stage verification protocol
01
02
03
Raw copper audit
High-amperage burn-in
Final seal verification
Inspection of high-conductivity core wiring and heavy-gauge terminal blocks.
Extended bench testing under continuous peak load and thermal stress.
IP65 weather-sealing check and BIS standards compliance logging.


